Manufacturing Solution Supplier!

(1). LED Studio/Filming Lights; (2). Brushless Tools; (3). PCB'A Production, and MCU Development Electronics, and APP Softwares; (4). 4500sqm, 100+ workers, 10+ Engineers(Electronics & Mechanicals Design).

Manufacturing Solution Supplier!

Pre-Production Approval Process(PPAP)

(1). Developed Sample Test(After developing); (2). Pre-Production 10 Samples Test; (3). Trial Production 100~1000pcs Index.

Pre-Production Approval Process(PPAP)

IEC/EN62776 Self-ballast(Retrofit) LED Tube

2017-2-24 15:25:40

In December 2014, IEC(International Electrotechnical Commission) formally published by the new standard IEC62776 for Self-ballast(Retrofit) LED tube.

In April 2015, EU formally published by the new standard EN62776 for Self-ballast(Retrofit) LED tube.

Note: for voltage withdrawing test, we have to make one end shorted and connect the tester's supply, and the other end must pass 4U+2000V, too. (IEC/EN60598)
-
-
Correct: One end power L N, and the other end "shorted".
-

-
-
Wrong: One end power L N, and the other end "Open".
-

-
-
Wrong: One end shorted and L, and the other end shorted and N.
-

-
-

-
-

-
-

Online Services

 gtkled  Truman  Grace  Shure