Manufacturing Solution Supplier!

(1). LED Studio/Filming Lights; (2). Brushless Tools; (3). PCB'A Production, and MCU Development Electronics, and APP Softwares; (4). 4500sqm, 100+ workers, 10+ Engineers(Electronics & Mechanicals Design).

Manufacturing Solution Supplier!

Pre-Production Approval Process(PPAP)

(1). Developed Sample Test(After developing); (2). Pre-Production 10 Samples Test; (3). Trial Production 100~1000pcs Index.

Pre-Production Approval Process(PPAP)

Product Show

Male V-mount Stong Clamp for Tripod

Product Numbers:SLK-200832

Product description:1. Size: 80*80*35mm/162g; 2. Pole Diameter: 25~40mm; 3. Load: 5kgs

INTRODUCTION:



-
-
-
-

Online Services

 gtkled  Truman  Grace  Shure